In 2004 New Heart Fellowship was a relatively new congregation, about three years old, that had outgrown its first church facility. The church purchased acreage near their existing church on County Line Road in Broken Arrow for the construction of their new facility. Much of the design was driven by the fact that most of the frontage property was in flood plain, and the areas where buildings could be located was limited.
It was determined through the Master Plan studies that this facility could accommodate approximately 900 on this site.
The project will be built in phases. The Multi-Purpose Building was constructed in 2004, providing worship space and a full-time day school. The next phases will include a 900 seat Sanctuary Building and additional educational spaces.
Phase 1 -Multi-Purpose Building – 24,843 sf
Final Phases -Sanctuary Building – 15,000 sf; Educational Building – 12,460 sf; connecting corridors – 1,800 sf.