Foundation Church (previously named Ridgeway Baptist Church) began to experience a rapid rate of growth in 1998 and 1999. Their facilities and land were of insufficient size to meet their anticipated growth, so the congregation purchased 20 acres of undeveloped land along the east side of Route 97 between Sand Springs and Sapulpa for their new facilities. The master plan was designed for 2,000 for a single service, and multiple services will increase this capacity significantly. It was designed for three major phases:
Phase 1 – 46,000 sfMULTI-PURPOSE BUILDING. Iin 2001, this building accommodates up to 650 in a single service in a “gymnatorium”, and was also design to serve as the 1st through 12th grade facilities for Sapulpa Christian School.
Phase 2 – 100,000 sf MULTI-PURPOSE BUILDING – A larger version of the first Multi-Purpose Building that will be constructed in the future will allow the congregation to reach 2,000. The first Multi-Purpose Building will then become the Youth Center.
Phase 3 – 78,000 sf SANCTUARY – When attendance has reached 2,000, the permanent sanctuary will be constructed at the front of the site.
Builder – Vista Construction, Sapulpa, OK 918-227-1800